Building Pics - April / May / June 2003

Floors are poured, the Walls are going up, the HVAC,
Plumbing and Electrical work is moving a long at a rapid pace

 

Main Doors 2nd Floor

Main Lobby 2nd Floor

Kitchen 2nd Floor

Kitchen 2nd Floor

Board Room 2nd Floor

Bathroom 2nd Floor

Bathroom 2nd Floor

Library / Study Area 2nd Floor

Attic

Attic

Fitness Center 1st Floor

Fitness Center 1st Floor

Bunk Room(s) 1st Floor

Main Hall 1st Floor

Shower Area 1st Floor

Office 1st Floor

Apparatus Floor 1st Floor

Main Electric Panel 1st Floor

Oil Storage 1st Floor

 

 

 

BACK